STO Project Controls
Only two methods of controlling cost on an STO event are effective, 1) control the scope of work 2) control the indirect costs. The latter is the most profitable.
Only two methods of controlling schedule overruns on an STO event are effective, 1) increase worker wrench-time 2) execute a flawless, early start-up. The latter is the most profitable.